VOLT UAE Dubai Silicon Oasis is a data center project in Dubai Silicon Oasis, United Arab Emirates, operated by VOLT UAE. It has been announced and has not yet reached the land or permitting stage. It is planned for 29 MW of IT load.
Latest change on record: entered the record as announced on 1 April 2026. Record last checked against its sources on 21 October 2026.
Next gate to watch: Power arranged.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
How United Arab Emirates approves, powers and taxes data centers is on Data center rules in United Arab Emirates.
Dubai holds 6 active projects with 129 MW of planned IT load between them, and VOLT UAE Dubai Silicon Oasis ranks second by planned capacity. Of those, 1 is operational, 1 is operational and expanding, 1 is under construction and 3 are announced only. No third party publishes a colocation vacancy rate for Dubai, and ArusGrid does not estimate one.
It is the only VOLT project ArusGrid tracks. Named funding comes from Dubai Integrated Economic Zones Authority (DIEZ). No user of the capacity is on the public record as of 2026-10-01, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.
The stage was recorded as announced only on 1 April 2026.
The US export control position for advanced AI chips in the United Arab Emirates, as of 14 July 2026, is recorded as “Country Group A:5 with Supplement No. 8 approved end users”. ArusGrid holds 4 public sources for this project, the latest dated 24 April 2026, and last checked the record on 21 October 2026.
One or two hard signals sit behind the announcement. The rules are fixed and published on the Methodology page.
Announced as an AI-ready facility by both joint-venture partners. No cooling, density or tenant disclosure.
Nothing found in the public record. This describes the record, not the company, and it is not evidence that access was sought or denied. Criteria are published on the Methodology page.
Country Group A:5 with Supplement No. 8 approved end users · Country Group A:5 with Supplement No. 8 approved end users (2026-07-14) source
Checked on 2026-10-01. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.
No published price band exists for United Arab Emirates, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.
All projects in Dubai · All projects in United Arab Emirates · All projects announced only · Data center rules in United Arab Emirates · Full directory
Project team on other projects: Schneider Electric