Gulf Data Hub Abu Dhabi (ICAD) is a data center project in Abu Dhabi, United Arab Emirates, operated by Gulf Data Hub. It is operational and expanding. It is planned for 64 MW of IT load. The operator reports 16 MW running.

Latest change on record: moved to expanding on 28 August 2026. Record last checked against its sources on 21 October 2026.

Open on the mapSuggest a correction
Stage
Expanding
Planned IT load
64 MW
Running now
16 MW
Operators rarely publish this
Operator
Gulf Data Hub
Colocation
AI workloads
No signal either way
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How United Arab Emirates approves, powers and taxes data centers is on Data center rules in United Arab Emirates.

Where it sits

Abu Dhabi holds 7 active projects with 434 MW of planned IT load between them, and Gulf Data Hub Abu Dhabi (ICAD) ranks second by planned capacity. Of those, 3 are operational and expanding and 4 are under construction. No third party publishes a colocation vacancy rate for Abu Dhabi, and ArusGrid does not estimate one.

Gulf Data Hub has 1 other in the United Arab Emirates tracked by ArusGrid, including Gulf Data Hub Dubai Silicon Oasis campus. It sits on the ICAD campus. Named funding comes from KKR on the equity side. No user of the capacity is on the public record as of 2026-10-01, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.

The dated record runs from under construction in July 2021 to operational and expanding on 28 August 2026.

The US export control position for advanced AI chips in the United Arab Emirates, as of 14 July 2026, is recorded as “Country Group A:5 with Supplement No. 8 approved end users”. ArusGrid holds 2 public sources for this project, the latest dated 28 August 2026, and last checked the record on 21 October 2026.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseYes
Three or more sourcesNo
Dated source in the last 24 monthsYes

AI workloads

StatusNo signal either way

Multi-tenant colocation with no AI tenant, workload or cooling disclosure.

Access to AI chips

GradeNo public signal

Nothing found in the public record. This describes the record, not the company, and it is not evidence that access was sought or denied. Criteria are published on the Methodology page.

US licence required for this destination as enforcedYes
A party headquartered in China or Macau on the projectNo
Country-level export frameworkYes
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

Country Group A:5 with Supplement No. 8 approved end users · Country Group A:5 with Supplement No. 8 approved end users (2026-07-14) source

Phases

ICAD 1 · Operational16 MW, target 2022

Stage history

2021-07Under construction · midisgroup.com
2026-08-28Expanding · gulfdatahub.ae

Who is behind it

OperatorGulf Data Hub · Colocation
Funder, EquityKKR

Who uses the compute

Checked on 2026-10-01. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.

Colocation price per kW of IT load per month

No published price band exists for United Arab Emirates, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Project team
Mechanical and electrical worksSite & Power DK · Nov 2022 · completed Confirmed source ↗
ICAD III data center MEP works, engineering, supply, installation, five levels of testing and commissioning, Tier III TCDD and TCCF
Land
Industrial estateIndustrial City of Abu Dhabi (ICAD), Mussafah · 32,000 sqm · Nov 2022 Reported source ↗
Plot for ICAD III, 6,500 sqm initial white space in up to 18,000 sqm built-up area

Sources checked 2026-10-21

  1. Gulf Data Hub locations (Gulf Data Hub, 2026-08-28)
  2. Site & Power DK announce successful completion of Gulf Data Hub ICAD III in Abu Dhabi (Midis Group, 2022-11-30)

More in Abu Dhabi

Also run by Gulf Data Hub

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.