China Telecom Cloud Computing Inner Mongolia Information Park
Horinger, Inner Mongolia, China · Horinger and Hohhot market · location approximate to district level
Also listed as 中国电信云计算内蒙古信息园, 云计算内蒙古信息园, China Telecom Inner Mongolia Information Park and Shengle.
China Telecom Cloud Computing Inner Mongolia Information Park is a data center project in Horinger, China, operated by China Telecom (中国电信). It is operational. The operator has not published an IT load figure. It is planned for 100,000 racks. ArusGrid does not convert racks into MW.
Latest change on record: entered the record as operational on 18 November 2014. Record last checked against its sources on 22 October 2026.
Planned IT load
Not published
Running now
Not disclosed
Operators rarely publish this
Operator
China Telecom (中国电信)
Telco
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started
This project is built or running, so every gate counts as passed.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
China, 2026-10-12. China coverage is a pilot of one cluster, Zhongwei in Ningxia, entered on 12 October 2026 from Chinese-language primary and state press sources. Other Chinese hubs are not yet covered, so no China total here describes the country. Many Chinese projects publish rack counts and no megawatts. ArusGrid records the rack count and leaves capacity blank rather than convert it.
Where it sits
Horinger and Hohhot holds 10 active projects with 298 MW of planned IT load between them, and China Telecom Cloud Computing Inner Mongolia Information Park has no published figure so it sits outside that ranking. Of those, 3 are operational, 1 is operational and expanding, 1 is under construction, 2 are at the land and permitting stage and 3 are announced only. No third party publishes a colocation vacancy rate for Horinger and Hohhot, and ArusGrid does not estimate one.
China Telecom has 12 others in China tracked by ArusGrid, including China Telecom Smart Cloud Base, Huailai Park (中国电信智云基地怀来园区), China Telecom Smart Cloud Base, Zhangbei Park (中国电信智慧云基地张北园区) and China Telecom Qingyang Computing Center. It sits on the China Telecom Inner Mongolia Information Park. The named user of the compute is Baidu (reported, unconfirmed).
The stage was recorded as operational on 18 November 2014. The money on record is CN¥17.3bn as of November 2014, the announced investment. Power comes from 华电新能源 through a renewable power purchase agreement (reported, unconfirmed). Cooling uses direct liquid cooling.
The US export control position for advanced AI chips in China, as of 7 October 2026, is recorded as “Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026”. ArusGrid holds 11 public sources for this project, the latest dated 9 October 2026, and last checked the record on 22 October 2026.
How well evidenced is it
Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.
Named funderNo
Disclosed client (reported)Yes
Committed or approved capitalYes
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes
AI workloads
StatusConfirmed
Xinhua Finance (2026-08-22) says the park runs 16,000 PFLOPS of compute, of which 15,600 is intelligent computing.
Access to AI chips
GradeLicence required for a party
A party to this project (its operator, that operator's group, a funder, or a confirmed client) is headquartered in China or Macau or has an ultimate parent there. US rules require a licence for advanced AI chips destined to such entities wherever they are located. This describes the rule and says nothing about whether a licence was sought, granted or refused. Criteria are published on the Methodology page.
US licence required for this destination as enforcedYes
A party headquartered in China or Macau on the projectYes
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo
Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 · Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 (2026-10-07) source
Stage history
Who is behind it
OperatorChina Telecom (中国电信) · Telco
Who uses the compute
Tenant · hyperscalerBaidu · reported, unconfirmed
as of 2014-11-18
China Telecom's 2014 release says Baidu was a tenant in the first four operating buildings. Its current status is unknown.
Source · 中国电信内蒙古资源池全面升级天翼云实力 (China Telecom Tianyi Cloud, 2014-11-18)
Money at this site
Announced investment, 2014-11CN¥17.3bn
The figure covers the whole campus.
Colocation price per kW of IT load per month
No published price band exists for China, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.
Project team
Construction supervisor中邮通建设咨询有限公司 · CNY 3.72m · Mar 2026 Reported source ↗ Supervision for B2 and B4 computing centres.
Design and build contractor中通服咨询设计研究院有限公司 · CNY 250.13m · Mar 2026 Reported source ↗ EPC for B2 and B4 computing centres and outdoor works, jointly with 中亿丰建设集团股份有限公司. Results released 2026-03-13.
Design and build contractor中亿丰建设集团股份有限公司 · CNY 250.13m · Mar 2026 Reported source ↗ Joint EPC winner for B2 and B4 computing centres.
Design and build contractor中通服咨询设计研究院有限公司 · CNY 566.71m · Apr 2026 · bid submitted, result pending Reported source ↗ First candidate, D区 phase 1 lot 1: D7 and D10 data centres plus D3 and D11 generator platforms (D区 total about 157,000 sqm).
Design and build contractor华信咨询设计研究院有限公司 · CNY 554.7m · Apr 2026 · bid submitted, result pending Reported source ↗ First candidate, D区 phase 1 lot 2: D6 and D9 data centres plus outdoor works.
Mechanical and electrical works华为技术服务有限公司 · Sep 2026 Reported source ↗ Consortium member with 华信咨询设计研究院 on the B12 and B16 M&E EPC. Joint award 314 million yuan including tax.
Power supply
Renewable power deal华电新能源 · Aug 2026 Reported source ↗ Matched generation of 360MW, not data centre load. 360MW wind-solar-storage integrated direct-supply pilot with 64.8MW/259.2MWh storage; point-to-point direct supply to machine rooms; 43% on-site consumption; >95% green incl. green trading · National Data Bureau first-batch 算电协同 demonstration project · Applies to the whole campus.
Dedicated substation中国电信股份有限公司云计算内蒙古分公司 (third 220kV substation, own investment) · 1,080 MVA · 220kV · Jun 2026 Confirmed source ↗ New 220/10kV substation in the south-east corner of zone B of the information park. Planned 6 x 180 MVA transformers, three duty and three standby. Two 220kV cable feeds of 1.4 km in total come from overhead lines from the Huanghesha (黄合少) 500kV substation, built by Inner Mongolia Power's Hohhot branch. The supply plan gives a new power load of about 540 MW, phased at 90 MW in 2026, 340 MW in 2027 and 540 MW in 2028. That is electrical load, not IT load. Project approval 呼发改审批电字〔2026〕25号. Works planned Aug 2026 to Apr 2028. · Applies to the whole campus.
Water and cooling
CoolingDirect liquid cooling Reported source ↗ B12 intelligent computing centre: 16.96 MW of 20.488 MW IT is liquid cooled (about 83 percent), built for a 10,000-card supernode cluster.
Sources checked 2026-10-22
- 中国电信内蒙古资源池全面升级天翼云实力 (China Telecom Tianyi Cloud, 2014-11-18)
- China Telecom Cloud Computing (Inner Mongolia) Information Park (China Daily, 2016-09-08)
- 中国电信内蒙古分公司:计划在算力领域累计投入超百亿元 建设吉瓦级超大规模绿色智算枢纽 (Xinhua Finance, 2026-08-22)
- 能源与AI双向奔赴:探寻算电协同内蒙古实践 (C114通信网, 2026-08-24)
- 约14.2亿!中国电信云计算内蒙古信息园D区启动招标、B区算力中心项目招标结果公示 (DTDATA via 新浪财经, 2026-03-25)
- 投标报价约11.21亿!中国电信云计算内蒙古信息园D区算力中心一期EPC总承包中标候选人公示 (DTDATA via 新浪财经, 2026-04-23)
- 半年超157亿元!运营商智算中心加速“跑”(附图) (通信产业报 (网易号), 2026-07-14)
- 独家!运营商AIDC基建投资监测:7月份招标总金额46亿 中国移动占比超五成 (C114通信网, 2026-08-14)
- 独家!运营商AIDC基建投资监测:中移三大工程领衔 8月招标金额182亿 (C114通信网, 2026-09-03)
- 2026 年三季度 IDC/AIDC 领域 EPC 项目统计分析与 EPC 企业机会建议 (老林的智算笔记 (WeChat), 2026-10-09)
- 内蒙古自治区生态环境厅关于中国电信股份有限公司云计算内蒙古分公司2025年220kV变电站工程建设项目环境影响评价文件(辐射类)审批结果公示 (内蒙古自治区生态环境厅, 2026-06-07)
More in Horinger and Hohhot
Also run by China Telecom
All projects in Horinger and Hohhot · All projects in China · All China Telecom projects · All projects operational · Full directory