Converge Parañaque hyperscale data center

Parañaque, Metro Manila, Philippines · Greater Manila market · location approximate to city level
Why it stopped. Announcement only The only source was a CEO remark at a broadband launch in 2023. The partner was never named, and the company's own 2026 list of data centers and pipeline leaves it out. source The graveyard.

Converge Parañaque hyperscale data center was a data center project in Parañaque, Philippines, operated by Converge ICT Solutions. It was cancelled. ArusGrid keeps it on record and excludes it from every total. It was planned for 49 MW of IT load.

Record last checked against its sources on 11 September 2026.

Open on the mapSuggest a correction
Stage
Cancelled
Planned IT load
49 MW
Running now
Not disclosed
Operators rarely publish this
Operator
Converge ICT Solutions
Telco
AI workloads
No signal either way
Evidence grade
None

Where it sits

Greater Manila holds 9 active projects with 517 MW of planned IT load between them. Of those, 6 are operational, 1 is at the land and permitting stage, 1 is announced only and 1 is on hold. Published colocation vacancy in Greater Manila was 43.6% as of June 2026, on 90 MW of operational colocation capacity as counted by Cushman & Wakefield. Vacancy excludes hyperscaler self-build.

Converge ICT has 1 other in the Philippines tracked by ArusGrid, including Converge Angeles Data Center. Named funding comes from Converge ICT Solutions on the equity side. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.

Grid power for a large industrial user in the Philippines costs about US$0.12 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in the Philippines, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 2 public sources for this project, and last checked the record on 11 September 2026.

How well evidenced is it

Cancelled projects carry no evidence grade.

AI workloads

StatusNo signal either way

No public signal either way.

Who is behind it

OperatorConverge ICT Solutions · Telco
Funder, EquityConverge ICT Solutions

Who uses the compute

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.

Platform deals that include it

Converge ICT 2026 capex guidance
Other
US$400m

Platform capital spans several sites. It is never added to this project's own figure.

Colocation price per kW of IT load per month

No colocation price applies to this product (cancelled).

Build, land, power and water
Nothing found in public sources yet. Most contractors and utilities never name their data centre clients. Know who built it or where its power comes from? Tell us.

Sources checked 2026-09-11

  1. datacenterdynamics.com
  2. baxtel.com

More in Greater Manila

Also run by Converge ICT

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.