CtrlS Datacenters EECd Hyperscale Campus (with National Telecom) was a data center project in Si Racha (EECd / Digital Park Thailand), Thailand, operated by CtrlS Datacenters. It was cancelled. ArusGrid keeps it on record and excludes it from every total. It was planned for 150 MW of IT load.
Latest change on record: entered the record as cancelled on 28 August 2026. Record last checked against its sources on 11 September 2026.
EEC (Eastern Seaboard) holds 21 active projects with 3,703 MW of planned IT load between them. Of those, 2 are operational, 1 is operational and expanding, 9 are under construction, 7 are at the land and permitting stage and 2 are announced only. No third party publishes a colocation vacancy rate for EEC (Eastern Seaboard), and ArusGrid does not estimate one.
CtrlS has 5 projects elsewhere in the dataset tracked by ArusGrid, including CtrlS Chandanvelly datacenter park, CtrlS Mumbai datacenter campus (DC1 to DC7) and CtrlS Bodh Gaya AI Factory. Named funding comes from CtrlS Datacenters on the equity side and National Telecom (NT). No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.
The stage was recorded as cancelled on 28 August 2026. The money on record is THB 15bn (about US$429m) as of August 2023, the announced investment.
Grid power for a large industrial user in Thailand costs about US$0.10 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Thailand, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 4 public sources for this project, the latest dated 11 July 2023, and last checked the record on 11 September 2026.
Cancelled projects carry no evidence grade.
150MW greenfield hyperscale campus (>=100MW). CtrlS is a Rated-4 hyperscale operator; no Thailand-specific cooling or GPU spec published.
No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.
The figure covers the whole campus.
No colocation price applies to this product (cancelled).